Met a Supplier at CPHI? Don’t Place an Order Yet — Check These 6 Things First

Created on 10.16
Trade exhibitions make supplier sourcing look easy.
You meet a company.
You see the products.
You exchange business cards.
The supplier says:
"Yes, we can make it."
Everything sounds good.
But after the exhibition, the real qualification process begins.
In recent pharmaceutical exhibition discussions, we noticed that buyers often collect dozens of supplier contacts but later struggle to decide which ones are actually worth testing.
The reason is simple:
A good booth is not the same as a good supplier.
Before moving from exhibition conversation to sample order or commercial purchase, here are six things worth checking.

1. Can the Supplier Understand Your Actual Specification?

At the booth, buyers often say:
"We need 10 mL vials."
or:
"We are looking for 1 mL PFS."
That is enough to start a conversation.
It is not enough to start production.
After the exhibition, send the supplier your actual drawing or specification.
Then watch carefully.
A reliable supplier should ask about:
Glass type, dimensions, neck finish, closures, tolerances, quantity and application.
If the answer is only:
"No problem, we have this."
without checking the drawing, be careful.
For pharmaceutical packaging, "similar" and "same specification" are very different things.

2. Ask for the Exact Sample You Will Buy

Exhibition samples are usually display samples.
They may show the supplier's production range, but they may not be the exact product you need.
Before qualification, confirm:
Is the sample made from the same glass?
Is it the same drawing?
Is it from normal commercial production?
Will the commercial order use the same specification?
For cartridges and prefilled syringes, also confirm the matching components.
A sample that looks beautiful under exhibition lighting does not automatically mean it will work on your filling line.

3. Check the Documents Before You Spend Months Testing

A common problem appears after sample testing starts.
Purchasing likes the supplier.
Technical teams like the sample.
Then QA asks for:
COA, technical drawing, product specification, glass composition, ISO certificates, test reports or batch traceability.
Suddenly, the supplier cannot provide them.
Now the project stops.
The better approach is to ask for the basic qualification package early.
You do not need every document on Day 1.
But you should know whether the supplier is capable of supporting your quality process.

4. Do They Really Have the Capacity They Claimed?

At exhibitions, almost every supplier says:
"Large capacity."
But "large" means different things to different companies.
If your annual requirement is 3 million vials, ask:
What is your normal monthly production for this size?
What is the regular commercial lead time?
How do you manage peak-season orders?
If your project requires 500,000 pieces every month, a supplier who can only comfortably produce 100,000 pieces is not the right second source.
Capacity should match the real project—not the marketing brochure.

5. Look at Their Follow-Up After the Exhibition

This is surprisingly useful.
A supplier may look very professional at the booth.
But after the exhibition:
  • Do they reply within a reasonable time?
  • Do they remember your product requirement?
  • Do they send the promised drawing?
  • Do they answer technical questions clearly?
  • Do they keep changing the quotation?
  • Do they send documents when promised?
Supplier follow-up gives you a preview of future order communication.
If communication is already difficult before the first order, it usually does not become easier after payment.

6. Check the Commercial Details Early

Before comparing final prices, confirm:
Product included → Packing → MOQ → Lead time → Incoterm → Payment → Samples → Documentation
For example, one PFS quotation may include only the glass barrel.
Another may include:
Glass barrel + stopper + plunger rod + needle/tip
One vial supplier may quote EXW.
Another may quote FOB.
A lower number is not automatically a lower cost.

After CPHI, Do Not Follow Every Supplier

A buyer may return from an exhibition with 50 business cards.
You do not need 50 suppliers.
You need a few suppliers who can actually support your project.
A practical post-exhibition screening process is:
Drawing → Sample → Quality Documents → Technical Review → Trial Order → Commercial Supply
Exhibitions are good for discovering suppliers.
Qualification is what tells you which suppliers are worth keeping.
So after your next pharmaceutical exhibition, instead of asking:
"Who gave me the lowest price?"
Ask:
"Which supplier understood my project well enough to become a reliable second source?"
If your team is currently evaluating pharmaceutical glass vials, ampoules, cartridges, PFS or RTU packaging after an exhibition, sharing the existing drawing and required document list is usually the fastest way to determine whether the project is worth moving forward.
国际业务经理